Why Seismic Restraints Are Now Being Enforced on Commercial HVAC Installations

If you're planning a commercial HVAC upgrade or fit-out, you may have noticed a new item appearing in project requirements: seismic restraint. It isn't a new standard, but it's being enforced far more consistently than it used to be, and it's catching many building owners and project teams off guard partway through design or construction.
Seismic restraint for mechanical plant and ductwork falls under AS 1170.4, the Australian Standard for structural design actions relating to earthquakes, and the National Construction Code (NCC) references it directly. In recent years, we've seen a clear shift toward projects being asked to demonstrate seismic compliance where it previously wasn't scrutinised, including many standard commercial fit-outs that wouldn't have attracted this level of engineering attention.
What Seismic Restraint Actually Means for HVAC and Mechanical Plant
In practical terms, seismic restraint means suspended ductwork, indoor units, condensers and other mechanical plant need to be braced so they don't fail, shift or fall during ground movement. This isn't just about the equipment staying operational; it's about preventing a piece of plant from becoming a falling hazard to people below, or damaging other building services on its way down.
This requirement applies to buildings assessed at Importance Level 2, 3 or 4 under AS 1170.0 and the NCC, which covers the vast majority of commercial buildings, not just hospitals, data centres or other critical infrastructure. A standard office building, retail tenancy or industrial facility can sit well within scope, which is part of why so many project teams are encountering this requirement for the first time.
Why This Is Being Enforced More Now
Seismic restraint requirements for non-structural building services have technically existed in the standards for a long time. What's changed is enforcement. Certifiers, engineers, and project teams increasingly ask for evidence of seismic compliance as a standard part of sign-off, whereas in the past it received far less scrutiny.
The 2024 edition of AS 1170.4, the first full revision since 2007, also introduced more detailed requirements for building services, including minimum clearances between parts and components and a special study for Importance Level 4 buildings. In practice, this means more genuine engineering assessment on a project-by-project basis, which is part of why the requirement is being felt more sharply now than it was even a few years ago.
Why It Applies Even in Lower Seismic-Risk Areas Like NSW
A common assumption is that seismic bracing matters only in higher seismic-risk regions, and that a region like NSW, which isn't considered a high-risk earthquake zone, shouldn't need to worry about it. That assumption doesn't hold up against the actual requirement.
AS 1170.4 applies a minimum level of earthquake design across the whole country. A building's location, soil conditions, height and Importance Level together determine what's required, so a lower-risk region like NSW may mean lower design forces, but it doesn't remove the obligation. In other words, this is a compliance obligation that applies regardless of regional earthquake risk, not a judgement call. A building owner or project manager who assumes seismic bracing “doesn't apply” is working from an outdated understanding of how the standard operates.
What This Means If You're Planning a Commercial HVAC Project
The practical takeaway is that seismic bracing needs to be considered early, at the design stage, rather than added as an afterthought once a project is already under construction. Retrofitting seismic compliance into a partially completed installation is typically more expensive and disruptive than designing for it from the outset.
It can also interact directly with other compliance requirements in ways that aren't always obvious upfront. For example, where a ceiling or structure is fire-rated, standard metal fixings that penetrate the fire-rated structure may not be acceptable, so an alternative bracket or mounting method must be engineered to satisfy both fire and seismic requirements. We come across this on fit-outs with fire-rated ceilings. Discovering this tension partway through a project, after a design has already been approved and construction is underway, can mean a costly and time-consuming redesign under pressure.
How We Approach It
We build seismic compliance into the design conversation early, rather than waiting for it to be flagged during sign-off. Where a project has competing requirements, such as a fire-rated structure that limits fixing methods, we work through the engineering with the right specialists, including seismic and structural engineers where needed, so the solution is designed to meet both the fire and seismic requirements, not just the one that's easiest to solve for.
If you're planning a commercial HVAC project and want to understand what seismic compliance means for your building before it becomes a problem at sign-off, talk to the team early. It's much easier to have this conversation at the design stage than midway through construction.
Talk to the team about seismic compliance for your next HVAC project.